My current build is using two 8 channel receivers, one with telemetry. I am driving 12 servos which have an average draw of 150ma and stall at 2000ma. I am also running 5 ESC's of various capacity. Being a surface craft, it will have a run time of several hours. My plan is to use UBEC 10 amp/20A surge BEC(s). My plan is to use one BEC powering each receiver, rather than putting the load all on one.
The two BEC's will share batteries source(s). All motors, and accessories will share a common power supply(s).
My question is whether using multiple BEC's will cause any kind of an electrical loop(ground loop?) that might interfere with the radio, ect? Do I need to common ground the receivers?
I am a plug and play engineer( which means I know squat).
Thanks.
The two BEC's will share batteries source(s). All motors, and accessories will share a common power supply(s).
My question is whether using multiple BEC's will cause any kind of an electrical loop(ground loop?) that might interfere with the radio, ect? Do I need to common ground the receivers?
I am a plug and play engineer( which means I know squat).
Thanks.